home
my viper

prices
viper techs

create a gallery
search galleries
Order Status Codes
This page contains an explanation of Daimler Chrysler order status codes.

UNSCHEDULED
  • BB - fleet order only - review by bid department
  • BD - special equipment processing
  • BE - edit error - coding error which must be corrected before order can be considered for scheduling
  • BG - order has passed edit, but cannot be scheduled regardless of priority or sold status
    • F - Financial hold
    • B - model or option
    • B - build out
    • L - material restriction
    • M - material hold (fleet)
    • BX - good order available for scheduling
SCHEDULED
  • C - tentative schedule
  • D - firm schedule: serial number is assigned, appropriate time in station (5) working days
  • D1 - gateline: plant has sequenced the unit for production, estimated ship date assigned, approximate time in station is (12) working days
BUILD
  • E - framing
  • F - paint
  • G - trim
BUILT
  • I - unit is built pending final inspection
  • J - vehicle has passed final inspection: but not released to carrier unit requiring vendor work (sunroof, special package, etc.)
  • JB - shipped to body vendor
  • JE - shipped to emissions
  • JS - shipped to storage
  • KZ - released by plant and invoiced
TRAFFIC CODES
  • KZL - released but not shipped
  • KZM - first rail departure
  • KZN - first rail arrival
  • KZO - delayed/received
  • KZT - second rail departure
  • KZU - second rail arrival
  • KZX - delivered to dealer



All times are GMT -5. The time now is 04:01 PM.

ViperAlley.com is in no way affiliated with Daimler Chrysler. Dodge, Viper, RT/10, the Viper logo and likeness are registered trademarks of Daimler Chrysler.
The contents of this site are owned by ViperAlley.Com and may not be used or reproduced without the express written permission of the Administrator. -->